/Aristotl
Language
Demo

Instruction before the forklift, not after

Temps start at 06:00 on a Monday. Aristotl gets the site rules to their phone first and keeps every forklift certificate in one view.

The temp is at dock 4 before the site rules are.And the forklift certificate sits in a third folder.

Where the standard slips

  1. 01

    On the floor before the site rules

    Agency workers start the day they are placed. The Thursday induction comes too late.

    In the Netherlands, Arbobesluit article 7.17c requires specific expertise to operate mobile work equipment such as forklifts.

  2. 02

    A dock change misses the night shift

    A new traffic route is briefed at 06:00 and reaches the late shift by word of mouth.

  3. 03

    Certificates live in three files

    Forklift, VCA and ADR records sit with HR, the agency and the site manager.

How logistics HQs instruct before the first shift

  1. 01

    Turn the site rules into lessons

    Upload the site rules, traffic plan and equipment instructions. Get short lessons with a check at the end.

    • Drafted in every language on the floor
    • Your documents stay the source of truth
    • Nothing live until you publish
    See AI course creator
  2. 02

    Place every temp in the right site

    Import the roster or hang a QR code at the gate. Workers land in their own site and team.

    • A link and QR code per site or team
    • Roster import with the assistant
    • No company email needed
    See multi-site training
  3. 03

    Run the safety round on the phone

    Forklift pre-use checks, safety rounds and cold-store readings as checklists, with proof per step.

    • Photo, signature or temperature per step
    • Scheduled per site
    • Late checklists escalate to the site manager
    See work instructions
  4. 04

    Know who may drive the forklift

    External forklift, VCA and ADR certificates next to your own training, with expiry dates.

    • Issuer, dates and proof per certificate
    • Renewal opens before expiry
    • A verify link for the client or inspector
    See training analytics
  5. 05

    Send the dock change to every shift

    Post the new traffic route to the site. Every worker confirms it, by name.

    • Target a site, region or team
    • Must-acknowledge updates
    • Named receipts and a pending list
    See internal communication

Roles and moments

Who does what in a shift

What changes on day one

TodayWith Aristotl
A Thursday induction for Monday's tempsSite rules on their phone before the first shift
Forklift certificates in three foldersOne overview with expiry dates
Safety rounds on a clipboardA photo per zone, in one day log
A dock change briefed to one shiftNamed receipts from every worker

Coordinating, onboarding and replacing staff has a price.See what it costs you today

Questions from logistics HQs

Yes. Aristotl starts from the SOPs, site rules and checklists you already have. Your team reviews every lesson before you publish.

Yes. Record them with issuer, dates and proof. They expire in the same overview as your own training, and each has a verify link.

No. Aristotl delivers and records theory, site rules, knowledge checks and certificate status. Practical instruction, assessment and supervision stay with the employer and qualified trainers.

Yes. They join with the site's link or QR code, or pick their name on a shared tablet, and read everything in their own language.

Yes. Keep the group standard and assign site-specific content by site, region or team.

Read next

Where to start

Ready when you are

Every worker instructed before the first pallet.

See your warehouses in Aristotl in a 30-minute call.