Prove who was trained before the auditor asks
Temps, contractors and new operators start before the trainer is free. Aristotl trains them on the line and keeps the record per person.
The auditor picks three names from the production floor.One is a temp who started on Monday.
Where the standard slips
- 01
The temp starts before the trainer is free
Agency staff and contractors are on the line before anyone can walk them through hygiene and zoning.
- 02
Attendance is not competence
A signature on a list doesn't show the CCP operator can do the check and handle a deviation.
EU Regulation 852/2004, Annex II, Chapter XII: food handlers must be supervised and instructed in line with their work.
- 03
An allergen change needs a trace
A new ingredient or changeover rule has to reach every shift, with proof of who received it.
How food producers keep the training record
- 01
Turn HACCP procedures into lessons
Upload hygiene rules, the allergen procedure and CCP instructions. Your quality team reviews every draft before publishing.
- Short lessons with a check at the end
- Drafted in the languages on the floor
- Nothing live until you publish
- 02
Train temps before their first shift
A QR code per site or team puts agency staff and contractors in the right place on day one.
- A link and QR code per site or team
- No company email needed
- Temps and contractors included
- 03
Record every CCP check on the phone
Temperatures, cleaning and allergen changeovers as checklists, with a reading or photo on the steps that matter.
- Temperature with a set range
- Photo, signature or choice per step
- Countersign where you need a second check
- 04
Pull the day log for the auditor
Every checklist with its proof, per site and per day, ready as CSV or PDF.
- Proof, comments and exceptions
- Corrective actions on the record
- Completion per site and person
- 05
Confirm the allergen change by name
Send the new procedure to every production team as must-acknowledge. See who confirmed and who is still pending.
- Target a site, region or team
- Named receipts
- Export receipts for the auditor
Roles and moments
Who does what in a shift
- QA and food safety managerPublishes the allergen procedureOnce, for every site and every language.
- Production managerSees who is trained per lineBefore the audit, not during it.
- Line leadCountersigns the CCP checklistReadings and exceptions on the record.
- CCP operatorLogs the temperature on the phoneOut-of-range readings stay visible.
What changes on day one
| Today | With Aristotl |
|---|---|
| Training lists in a binder | A record per person, per site |
| Temps trained when the trainer is free | A QR code that trains them on day one |
| Paper CCP logs collected at week's end | Readings on the phone, in one day log |
| An allergen memo on the notice board | Named receipts from every team member |
| External certificates in HR folders | One overview with expiry dates |
Coordinating, onboarding and replacing staff has a price.See how much you can save
Questions from food producers
Read next
HACCP training in food production: passing the auditHow to pass the training part of an IFS or BRCGS audit: induction before the first shift, instruction in each worker's language, evidence beyond a signature, an interval you keep.Guide · 9 min read
Training records an auditor can checkWhat auditors and inspectors ask for in the training part of a visit, the per-person record that answers it, and how to show one site's file during the visit.Guide · 7 min read
Where to start
Ready when you are
Audit-ready, every shift.
See your production sites in Aristotl in a 30-minute call.





