Machine safety instruction across plants
Updated
Short answer
Operators need machine instruction when they start on a post, on a new or changed machine, when changeover or lockout steps change, and after an incident. Belgian Codex art. I.2-21 names the first two and requires instruction to follow evolving risks, covering the rest. Dutch law ties it to each task and machine (Arbowet art. 8, Arbobesluit chapter 7).

Plant B gets the same filler as plant A, three months later. The installer's engineer trains the operators who happen to be on the Tuesday day shift. The night shift learns it from the day shift. Plant A has meanwhile changed a changeover step after a near miss, and nobody told plant B, because the machine was "the same".
The machine really was the same. Its instruction was not. That is the pattern in multi-plant manufacturing: equipment is standardised centrally, and instruction happens locally, once, to whoever was there.
Four moments that make instruction due
Belgian law is explicit about when instruction is due. Codex art. I.2-21 requires sufficient and adapted training at hiring, at a transfer or change of function, when work equipment is introduced or changed and when new technology is introduced, given during working hours, adapted to evolving risks and repeated when needed. Dutch law says the same in fewer words: Arbowet art. 8 requires effective information and instruction adapted to each worker's tasks, and supervision that it is followed.
| Trigger | What it looks like in a plant | Who needs instruction |
|---|---|---|
| New worker on the post | A hire, a transfer, an agency worker, a colleague covering from another line | That person, before they operate |
| New or changed machine | Installation, relocation, a new guard, a software update, a new format part | Every operator and technician on that machine, on every shift |
| Changed procedure | A new changeover, cleaning or lockout step | Everyone who performs that step |
| Incident or near miss | On this machine or on the same type in another plant | Everyone exposed to the same risk |
The last row is the one multi-plant groups miss. A finding on the filler in plant A is a finding for every filler of that type. How to get it to every exposed worker is covered in retraining after an incident.
What the work equipment rules add
On top of the general duty, both countries have work equipment rules that reach into the instruction itself. In Belgium, Codex Book IV Title 2 reserves the use of work equipment with specific risks to the workers charged with it, and requires adequate training and information, with written instructions where needed. In the Netherlands, chapter 7 of the Arbobesluit covers the expertise of workers (art. 7.6), maintenance, repair and cleaning (art. 7.5) and the information workers receive (art. 7.11a).
The manufacturer's side is fixed by the Machinery Directive: the instructions must come in the language of the country where the machine is used (Annex I, 1.7.4), a duty the Machinery Regulation (EU) 2023/1230 carries over when it applies from 20 January 2027. That manual is a source, not the instruction. It describes the machine as delivered, not as installed next to your conveyor with your guards and your formats.
Lockout: one procedure, every shift
Every machine must have a clearly identifiable means to isolate it from all its energy sources (Directive 2009/104/EC, Annex I, point 2.14; in the Netherlands art. 7.11 of the Arbobesluit). The isolator is hardware. The procedure built on it is yours: which points to isolate, in what order, how to verify zero energy, who holds the key, what happens when two crews work on the machine at once.
That procedure has to be instructed to everyone who clears a jam, cleans or maintains the machine, which on a three-shift line is more people than the maintenance team. It is also the procedure most often shortened under pressure, so instruction that shows the real lockout points on this machine beats a generic slide on energy.
Changeover: the task that is different on every line
A changeover is a task with its own steps, its own hazards and its own shortcuts. It happens a few times a shift, often under time pressure, and the version people follow is the one they were shown. When one plant improves a step, the others keep the old version until someone tells them. Treat a changed changeover as a changed procedure: a trigger, with a new version and a record of who received it. The wider shift problem is covered in training in shift-based operations.
Agency workers and the werkpostfiche
Agency workers often start on the posts with the highest exposure. In Belgium, where a post is under mandatory health surveillance, the user company completes a werkpostfiche that sets out the risks, the required qualifications and the instruction for that post (Codex Book X, Title 2). Without it, and without having been informed, the worker may not be placed on that post. Where no fiche is required, the duty to instruct on the machine before work starts still applies.
One machine, many plants
Across plants, the unit of instruction is the machine type, not the site. What works:
Machine instruction across plants
- One master instruction per machine type, owned by one named person
- A short local annex per plant: layout, guards, lockout points, formats, local rules
- A version on both, so a change in either is visible
- A change or incident on one machine reviewed for every machine of that type
- A record per person of which version of which machine they were instructed on
How Aristotl handles it
Aristotl turns your machine instructions, lockout procedures and changeover steps into courses of 3-5 minutes an operator finishes on their own phone before working the machine, with a knowledge check in each and the text in the language each person reads. Your team reviews each course and nothing reaches the floor until you publish. Changeover and lockout steps can also run as checklists on the line, with a photo, signature or reading per step.
When a procedure changes, the new version reaches every shift at once, and completion is viewable per site and version in the platform, so you can see which plant is still on the old changeover. An incident finding goes out as a must-acknowledge update with named receipts.
What it does not replace: practical instruction at the machine, the competence assessment before someone operates alone and supervision on the floor.
Take the machine you installed or changed most recently, and check whether every operator on all three shifts was instructed on its current lockout and changeover steps.
Sources
- Codex over het welzijn op het werk (Belgium), art. I.2-21, Book IV Title 2 and Book X Title 2
- Arbobesluit (Netherlands), chapter 7, work equipment
- Arbeidsomstandighedenwet (Netherlands), article 8
- Directive 2009/104/EC on the use of work equipment, Annex I
- Directive 2006/42/EC on machinery, Annex I, section 1.7.4
- Regulation (EU) 2023/1230 on machinery
Frequently asked questions
Read next
Training in shift-based operationsHow to train rotating, night and continuous shifts: one version for every crew, in working hours before their next shift, with changeover and handover trained as procedures.Guide · 6 min read
After an incident: getting the finding to every exposed workerGuide · 5 min read
Version control for training content across sitesGuide · 7 min read
What Belgian and Dutch law require for workplace instructionGuide · 5 min read
Workstation sheet for agency workers in Belgium (werkpostfiche)Glossary · 2 min read